 |
Due to corrosion, ground movements in the aggressive London clay and the additional loadings arising from the increased volume of traffic, some of these older pipes are reaching the end of their service lives. In 2003, Thames Water therefore started a major project to renew these pipes. The company uses plastic pipeline systems for water distribution mains in sizes up to and including 315 mm. |